Planning the electrical scope for your building
New construction
Share the drawing set, equipment schedules and bid date. Identify which electrical, lighting and low-voltage systems are included so the estimate can address the full scope.
Occupied properties
Tell us which areas must remain operational and when access is available. Shutdown requirements and coordination with tenants should be discussed before installation.
Renovations and upgrades
Include the proposed layout and equipment changes. Existing service capacity, wiring conditions and access can affect the work required.
Bring the electrical scopes together before construction
New commercial construction
Provide the electrical drawings, equipment schedule and bid date. Identify lighting, distribution, low-voltage systems and site work that need to be included so responsibilities can be coordinated with the project team.
Tenant improvements and occupied buildings
Share the proposed layout, new equipment and permitted working hours. Tenant improvement electrical work may need planned access and shutdowns around the people using the building.
EV charging and future capacity
When adding commercial EV charging, discuss parking locations and electrical demand with the wider project scope. Planning related system upgrades together helps define the work to be estimated.
Explore completed project locations
Our portfolio includes Harbor Sky and Tru by Hilton. View the project media, then share the scope and schedule for your own building with our team.


